Electrifying the Thames: Testing a smart maritime energy system

Energy transition Networks Net zero
Skyline of London

In collaboration with Marine Zero and Port of London Authority (PLA), LCP Delta delivered an innovation project for UK Power Networks to explore how the Thames could be electrified as a whole system. By combining vessel movement data with electricity network analysis, the project tested how maritime demand could interact with the grid through V2G, identifying practical pathways and future commercial opportunities.

The strategic challenge: Breaking the electrification deadlock

The decarbonisation of the Thames is stalled by a "chicken and egg" problem. Vessel operators are reluctant to invest in electric fleets without guaranteed charging infrastructure, while infrastructure providers cannot justify builds without proven demand. The core of the issue is a lack of a unified data lens; previous studies have treated marine operations and electrical network requirements in isolation, leaving stakeholders without a clear understanding of how electrification could be delivered in practice. This project sits at the intersection of energy networks, transport and urban infrastructure, highlighting the growing need for whole-system thinking in the energy transition.

The Electric Thames project is one of the first initiatives globally to explore electrification at the scale of an entire urban waterway, bringing together energy networks, vessel operators and infrastructure owners into a single system-level view.

How could the Thames go electric? Explore the Electric Thames project in this episode of Talking New Energy

Listen now

To move forward, UK Power Networks wanted to communicate a fundamental shift in perspective. They needed to understand not just where power was required but help vessel operators and site owners understand how that power could be transformed into a flexible asset rather than a liability. The goal was to replace uncertainty with a data-driven whole-energy system planning approach that could withstand commercial and regulatory scrutiny.

Our approach: Integrating data to drive decisions

As an innovation project, the focus was on testing new methodologies, improving data visibility, and solving real operational challenges for the Distribution Network Operator (DNO). Our methodology centred on replacing guesswork with high-fidelity demand intelligence. In close collaboration with Marine Zero, we began by processing over 100GB of raw AIS vessel data to map twelve months of movement, allowing us to predict peak energy demand with geographic precision. This moved the project beyond generic boat-type assumptions and into real-world operational density.

This intelligence was then funnelled into a "Connection Surgery" in partnership with UK Power Networks. We conducted detailed technical assessments of 19 specific sites to evaluate primary substation headroom. This process allowed us to bypass the usual delays of grid applications by identifying "quick-win" sites where existing capacity could support immediate electrification. To understand how technical feasibility and financial viability could translate into operational and commercial outcomes overtime, we developed and tested a repeatable six-step framework:

  1. AIS data analysis to map current and future demand.

  2. Vessel archetyping to understand specific charging requirements.

  3. Operational scenario modelling to test different rollout speeds.

  4. Site assessment to determine the right locations for charging sites as well as grid connection costs and network constraints.

  5. Business model innovation to identify third-party investment opportunities.

  6. Strategic shortlisting to prioritise high-impact, low-cost locations.

Outcome: From uncertainty to informed decision-making

The project has fundamentally changed the client’s decision-making landscape. As an innovation initiative under Ofgem’s Strategic Innovation Fund (SIF), the focus was on building the evidence base needed to understand how large-scale electrification of the Thames could work in practice. By moving from a “long list” of potential quays to a prioritised set of feasible locations, the project provided greater clarity to UK Power Networks and the Port of London Authority on where and how electrification could be delivered.

Key sites in and around central London emerged as strong candidates, not as immediate investment decisions, but as examples of where network capacity and operational demand could align. This has helped UK Power Networks, the Port of London Authority and wider stakeholders better understand the practical considerations, constraints and opportunities associated with electrifying the river, supporting more informed planning and future deployment decisions.

Financially, the narrative shifted from "cost centre" to potential value creation. Our Cost-Benefit Analysis showed that Vessel-to-Grid (V2G) technology could play a meaningful role in supporting electrification. We demonstrated that treating vessels as flexible energy resources could yield up to £1.28 million in annual value, highlighting the potential role of flexibility in reducing overall system costs. This provides stakeholders with a clearer understanding of the conditions under which fleet electrification could become viable.

Strategic impact: A scalable framework for future innovation

The project has strengthened the evidence base for river electrification by demonstrating that battery-powered vessels can deliver the same transport services as their diesel-powered counterparts, providing greater confidence in their operational potential. Alongside this, the development of a bespoke marine chargepoint has provided a practical example of how tailored infrastructure can support electrification in the marine environment. Financially, the project demonstrated how Vessel-to-Grid (V2G) technology could lower charging costs for vessel operators by enabling vessels to act as flexible energy resources, rather than solely as sources of electricity demand.

The true value of this project wasn't just in the technical modelling, but in demonstrating that there is a commercial, economic solution for maritime decarbonisation. Our approach was to treat the river as a whole-energy system, rather than a series of isolated engineering problems. By demonstrating that V2G could turn an electric vessel from a 'cost burden' into a 'revenue generator', we changed the entire strategic conversation.

We’ve provided our clients with a repeatable, data-backed framework that moves beyond the Thames, offering a scalable solution for ports and waterways across the UK to transition to a clean energy future with confidence.

Phillip Twiddy Project Director, LCP Delta

How can we help you?

Do you have a question, RFP or want to talk? Reach out and we’ll connect you with a member of our team.

Get in touch

Your questions answered

V1G (Smart Charging) refers to unidirectional controlled charging, where the rate of charging is increased or decreased based on grid signals to avoid peak times. V2G is bidirectional, meaning the battery can actually send power back to the grid to provide services like frequency response.

The Clean Maritime Plan is the UK government’s route map for transition to zero-emission shipping. It sets out the policy framework and targets required to meet the UK’s broader Net zero goals within the maritime sector by 2050.

This refers to the remaining capacity available at a local primary substation before it becomes overloaded. Understanding "headroom" is critical because it determines whether a new charging point can be connected quickly or if it will require expensive and time-consuming network reinforcements.